The project consists of pedestrian safety improvements to 27 intersections along the existing Metro Blue Line. The intersections along Los Angeles County’s first and most heavily used light rail line will be receiving new physical barriers to improve pedestrian safety, new and wider walkways and improved signage. The most visible improvements will be pedestrian gates and swing gates at intersections, new walkways poured with concrete instead of asphalt and accessibility improvements for persons with disabilities. DC Engineering Group was a key team member providing traffic engineering services to the project team along with permitting and coordination services.