Metro Blue Line Track and System Refurbishment project includes rebooting and replace grade crossings (Los Angeles and Long Beach), 7th Metro crossover (North and South) refurbishment, Expo junction refurbishment, track fasteners in tunnel and elevated sections, elevated structures fall prevention, Del Amo duct bank system reconstruction, mid-corridor OCS refurbishment, painting of Long Beach OCS/light poles, and new signage at all stations. DC Engineering Group prepared the traffic engineering plans for the construction phase of the project along with performing coordination services between the contractor and the City of Los Angeles.

Leave a Reply

Your email address will not be published. Required fields are marked *